154 Results found

Events and Exhibitions

Exhibitions and events IWWI – International Water, Waste & Infrastructure 2025 Egypt International Exhibition Center (EIEC) / Stand B7a Visit us in the German Pavilion at stand B7a! Exhibition Website 11-23-2025 to 10-25-2025 in Cairo, Egypt

Hydroelectric Power Plants

Hydroelectric Power Plants Flow measurement in turbine intakes and for cooling water

Precipitation Measurement with GPRS Transmission

Precipitation Measurement with GPRS Transmission Channel Networks - Fix Installation Measurements Application Determination of precipitation volumes for billing purposes within a water association consisting of several communities Setup of 7 precipitation measurement spots to detect stormwater volum

Case Studies

Case Studies Our case studies provide a deeper insight into the product and service solutions that we have realised together with our customers. The starting point in each case was a complex task into which we familiarised ourselves. Our solutions are designed to relieve our customers in their daily

Company

Flow Measurement in large WWTP Intake Area

Flow Measurement in large WWTP Intake Area Wastewater Treatment Plant - Intake Area Application Structured U profie made of concrete, 2.5 x 2.5 m (w x h) with dry weather channel Partially filled Very high discharge dynamics Risk of sedimentation during nighttime Definition of tasks Detection of flo

Volume Measurement Overhead Tank

Volume Measurement Overhead Tank Water Supply - Drinking Water Application Pipe with 0.25 m diameter, made of cast iron Fully filled Overhead tank featuring one single pipeline and flow in both directions Definition of tasks Comparison between water volumes consumed within the supply network during

Level Measurement Screening Debris Container

Level Measurement Screening Debris Container Wastewater Treatment Plant - Intake Area Application Screenings container, 2.5 x 2.5 x 4.0 m (w x h x d) Medium: solid mixture Bulk cone with undefined angle Ex-Zone 1 Definition of tasks Level detection inscreenings container for overflow monitoring and

Contactless Flow Measurement

Contactless Flow Measurement Wastewater Treatment Plant - Intake Area Application Concrete channel, width 1.2 m Partially filled Measurement point upstream of screen and grit trap High sedimentation loads Definition of tasks Intake measurement as control measure to avoid WWTP flood Contactless measu

Industry

Industry Flow measurement and turbidity measurement in industrial applications

Hello!
We are happy to answer any questions you may have about water and digitalization. We look forward to your call or email.