Application

  • Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls
  • Part filled
  • Rainwater and surface water
  • Short calming section
  • Manual detection of flow rates (level reading and Q/h-table) destroyed after flood

Definition of tasks

  • Continuous, automated flow measurement of turbine intake
  • High measurement accuracy despite short and unfavourable calming section for optimum use of the turbine for energy production
  • Maintenance-free system required since no personnel available
Dam Intake Measurement
Installation principle
Dam Intake Measurement

Solution

  • Ultrasonic transit time measurement with NivuFlow 650 was chosen due to the relatively clean medium.
  • A section of the channel bottom was planed with concrete improving the hydraulic conditions at the measurement point.
  • To achieve high accuracy after compensating skew flow behind the bend a crosswise 2-path measurement with transit time sensors mounted in different heights were installed.

Advantages

  • Easy installation, easy accessibility, high accuracy, reliability and maintenance-free.

Haven't found the appropriate Application?

Product Consultation

You want to have best information about our products? Our experts will gladly develop together with you the best system solution for your application.

Applications & Solutions

Applications & Solutions Our Applications and Solutions catalogue offers a brief overview to the most interesting application examples in a single pdf-document.

We will keep you informed.

Find out all you need to know about NIVUS - product news, special promotions, practical examples and much more