Wastewater Treatment Plant - Intake Area

Flow Large Intake Area

Kläranlagen
Flow Measurement in large WWTP Intake Area
View of measurement place
Flow Measurement in large WWTP Intake Area

Application

  • Structured U profie made of concrete, 2.5 x 2.5 m (w x h) with dry weather channel
  • Partially filled
  • Very high discharge dynamics
  • Risk of sedimentation during nighttime

Definition of tasks

  • Detection of flow rate to WWTP
  • Highest possible accuracy despite very high discharge dynamics featuring levels from 40 to 200 cm
Installationsprinzip
Installationsprinzip
Installationsprinzip

Solution

  • The measurement system Type OCM Pro CF with three CS2 flow velocity sensors has been used.
  • The sensors have been installed on wedge supports due to the risk of sedimentation.
  • A cable protection mounted directly on the sensor prevents damages through rat bites or similar.

Advantages

  • Easy programming thanks to internal channel shape presets
  • Required accuracies are met thanks to the use of 3 velocity sensors
  • High resolution of readings through 2 analog outputs with different scales for dry weather and rain weather

Used products

Haven't found the appropriate Application?

Product Consultation

You want to have best information about our products? Our experts will gladly develop together with you the best system solution for your application.

Applications & Solutions

Applications & Solutions Our Applications and Solutions catalogue offers a brief overview to the most interesting application examples in a single pdf-document.

We will keep you informed.

Find out all you need to know about NIVUS - product news, special promotions, practical examples and much more