Applications

Wastewater Treatment Plant - Discharge Area

Partial Discharge Section Flow Measurement

Kläranlagen
Partial Discharge Section Flow Measurement
Pump room with discharge line on rear wall
Partial Discharge Section Flow Measurement

Application

  • Pipe DN 500, made of stainless steel
  • Full filled
  • Service water tapping and feeding point

Definition of tasks

  • For secondary clarification control a partial discharge of the WWTP needs to be measured
  • Recorded values shall be forwarded to control system
Durchflussmessung im Teilablauf
Eingebaute Sensoren in der Leitung
Durchflussmessung im Teilablauf

Solution

  • A transit time measurement system Type NivuSonic using 2 measurement paths has been used.
  • The sensors have been installed in a measuring pipe with integrated ball valves. This allows to replace sensors under process conditions at any time.
  • Crosswise path arrangement virtually eliminates crossflow during calculation.

Advantages

  • Easy and robust installation using calibrated pipe segment
  • No bypass required
  • High accuracy and reproducibility

Used products

Haven't found the appropriate Application?

Product Consultation

You want to have best information about our products? Our experts will gladly develop together with you the best system solution for your application.

Applications & Solutions

Applications & Solutions Our Applications and Solutions catalogue offers a brief overview to the most interesting application examples in a single pdf-document.

We will keep you informed.

Find out all you need to know about NIVUS - product news, special promotions, practical examples and much more