1. Application

Wastewater
Water Supply
Hydropower
Surface water
Industry

2. Channel shape

Part filled channel
Part filled pipe
Full pipe

3. Measurement period

Permanent Measurement / Installation
Portable Measurement / Temporary Installation

4. Accuracy

Very high accuracy requirements
Average accuracy requirements

5. Sensor installation

Redundant System
Non-Redundant System

6. Level

Average level < 1 m
Average level > 1,0 m

7. Level measurement

Integrated level measurement
Separate level measurement

8. Ex Approval

Ex Approval
No Ex Approval
Ihr Ansprechpartner
Gerne sind wir bei der Auswahl des geeigneten Produktes behilflich.