1. Application

Wastewater
Water Supply
Hydropower
Surface water
Industry

2. Channel shape

Part filled pipe
Full pipe
Open channel

3. Measurement period

Permanent Measurement / Installation
Portable Measurement / Temporary Installation

4. Sensor installation

Invasive Measurement
Non-Invasive Measurement

5. Pressure

Pressure < 16 bar
Pressure > 16 bar

6. Sensor installation

Installation from inside
Installation from outside

7. Utilisation of Measurement Data

Visualisation / Hydrographs / Reports
Control / Visualisation / Hydrographs / Reports
Data Alignment to existing system
Ihr Ansprechpartner
Gerne sind wir bei der Auswahl des geeigneten Produktes behilflich.