Detection of precipitation, flow, level and flood covering a minimum period of 3 months to create a Sewage Master Plan. No mains power available.
No mains power supply available. Concrete pipe DN 250. Reliable detection of lowest flow rates during night hours
Flow Measurement with high discharge dynamics and turbulent discharge due to upstream feed pump.
Flow Measurement, detection and data transmission in ex-sector without any power supply.
Continuous flow rate measurement in dry weather conditions to detect extraneous water volumes within the channel system.