1. Application

Wastewater
Water Supply
Hydropower
Surface water
Industry

2. Range

Cooling Water
Refrigeration
Wastewater
Process Water
Process Industry other media

3. Measurement period

Permanent Measurement / Installation

4. Accuracy

Very high accuracy requirements

5. Sensor installation

Contactless measurement Clamp-On

6. Ex Approval

Ex Approval

7. Utilisation of Measurement Data

Data Alignment to existing system
Ihr Ansprechpartner
Gerne sind wir bei der Auswahl des geeigneten Produktes behilflich.