Partial Discharge Section Flow Measurement

Wastewater Treatment Plant - Discharge Area


Application

  • Pipe DN 500, made of stainless steel
  • Fully filled
  • Service water tapping and feeding point

 

Definition of tasks

  • For secondary clarification control a partial discharge of the WWTP needs to be measured
  • Recorded values shall be forwarded to control system

Solution

  • A transit time measurement system Type NivuSonic using 2 measurement paths has been used.
  • The sensors have been installed in a measuring pipe with integrated ball valves. This allows to replace sensors under process conditions at any time.
  • Crosswise path arrangement virtually eliminates crossflow during calculation.

Advantages

  • Easy and robust installation using calibrated pipe segment
  • No bypass required
  • High accuracy and reproducibility

Used products


Haven't found the appropriate product?

Haben Sie Ihre Lösung gefunden?

Wir sind sicher, wir haben die passende Lösung. Unsere Experten erarbeiten gerne mit Ihnen gemeinsam die perfekte Systemlösung für Ihre Anwendung.

Service

Sie haben Fragen zu NIVUS-Produkten bei Ihnen im Einsatz – dann sind Sie bei unserer Hotline genau richtig.

Hello
We are glad to have you here! For any question regarding water or digitisation we are happy to answer you call or your email message.
Team NIVUS
Im Täle 2
75031 Eppingen