Flow Measurement to Ensure Minimum Discharge

Flow Measurement to Ensure Minimum Discharge Flowing Waters - Irrigation & Drainage Systems Application Trapezoid channel 7.0 x 3.0 m (w x h) Partially filled Concrete channel bottom, embankment reinforced with water engineered stones Upstream adjustable water separator Definition of tasks Flow meas

Irrigation Channel Flow Measurement

Irrigation Channel Flow Measurement Flowing Waters - Irrigation & Drainage Systems Application Trapezoid concrete channel 9.5 x 2.5 m (w x h) Partially filled Very high volumes and velocities from time to time Definition of tasks Detection and control of the volumes removed for irrigation purposes T

Hybrid Flow Measurement in Main Collector

Hybrid Flow Measurement in Main Collector Channel Networks - Fix Installation Measurements Application Hood profile 2200 x 1980 Partially filled and full Precast concrete parts Sedimentation and temporary overflow Definition of tasks Detection of flow rates in a large main collector of a combined se

Level Measurement Pump Well

Level Measurement Pump Well Channel Networks - Pump Stations and Lifting Facilities Application Well diameter 1.8 m Depth of well 6.5 m Two wet installed pumps Pressure pipe installed in the centre Definition of tasks Pump control in alternate duty assist mode Switching points at levels of 2 m and 4

Flow Rate Monitoring on Pumps

Flow Rate Monitoring on Pumps Channel Networks - Pump Stations and Lifting Facilities Application Cast iron pipe DN 200 Full filled Old existing line (condition unknown), installed pipe system cannot be modified Definition of tasks Flow rate monitoring of feed pump to detect clogging and dry run Ten

Flow Measurement In Pipe That Could Not Be Shut Down

Flow Measurement In Pipe That Could Not Be Shut Down Channel Networks - Fix Installation Measurements Application To supply high accuracy flow meter on a new works application, cost was an issue and maintaining a Mag meter was another issue. Definition of tasks The task was to find savings by not in

Flow Measurement Pumps

Flow Measurement Pumps Flow Measurement Pumps Application Pipe diameter 0.15 m, made of steel Full pipe Wet pumps Definition of tasks Determination of efficiency and alert when reaching the wear limit Quick and cost-efficient upgrade of a wastewater pump station with a flow measurement Measurement i

No Shutting Down the Flow

No Shutting Down the Flow Channel Networks - Fix Installation Measurements Application The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel Application required to be installed in just 1 day Definition of tasks To be able to measure Flow without shutting do

Portable Measurements

Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions

Fix Installation Measurements

Fix Installation Measurements Channel Networks