Flood Protection Flow measurements for flood protection on dams or polders
Discharge Measurement in confined Spaces Channel Networks - Stormwater Treatment Facilities Application Stormwater overflow tank with cover Maximum overflow head 0.35 m Very low distance between weir crest and ceiling (0.50 m) Definition of tasks Detection of impoundage (beginning and end) Output of
Discharge Measurement Channel Networks - Stormwater Treatment Facilities Application Rectangular channel, 6 m width Partially filled Simultaneous overflow from several chambers into one common channel Short calming section upstream of measuring point Definition of tasks Detection of overflow volumes
Stormwater Treatment Facilities Flow measurement on spillways according to self-monitoring regulation
Intake Area Flow measurements and level measurement in open and closed channels and pipes in WWTP intake areas
Wastewater Treatment Plant Flow measurement, level measurement, interface or turbidity measurement in WWTPs
Water Supply Flow measurement and level measurement for water supplies
Flowing Waters Flow measurement in open flowing waters
Flow Measurement under poor hydraulic Conditions Channel Networks - Portable Measurements Application Drainage line DN 300 of leisure park Partially filled Concrete drainage line in ailing condition High discharge dynamics and turbulent discharge due to upstream feed pump Ex Zone 1 Definition of tas
Efficiency Measurement and Ex-proof GPRS Data Transmission Channel Networks - Portable Measurements Application Concrete pipe DN 1200 Partially filled Levels temporarily tending to zero No power supply available Ex Zone 1 Definition of tasks Temporary installation of a flow measurement system to inv