2088 Results found

NIVUS – Our Philosophy

The Perfect Measurement Technology for Your Needs State of the Art Technology, Quality and best Consultance The task we face is simply formulated: we want to provide you with the perfect measurement solution for your application. One of the most important key aspects for ideal measurement solutions

NIVUS - Research and Development

We plan the future every day With our own research and development division New things never come out of nothing. Those who want to achieve progress need to step ahead. This is why our team of physicists, engineers and technicians is committed to integrating our customer’s requirements into their da

Sludge Level Measurement Groundwater Treatment

Sludge Level Measurement Groundwater Treatment Flowing Waters - Irrigation & Drainage Systems Application Multi-stage container plant Chamber size 2.4 x 2.9 x 12.2 m (w x h x d) Aerated, limed groundwater with approx. 80 mg/l iron ochre contents Built-in lamella filters Definition of tasks Continuou

Contaminated Groundwater Flow Measurement

Contaminated Groundwater Flow Measurement Flowing Waters - Irrigation & Drainage Systems Application Trapezoid channel 1.5 x 0.5 m (w x h) Partially filled Concrete channel bottom, embankment reinforced with water engineered stones Remote measurement place Definition of tasks Flow measurement in par

Flow Measurement in Service Reservoir

Flow Measurement in Service Reservoir Flowing Waters - Irrigation & Drainage Systems Application Special profile, approx. 2.5 x 2.0 m (h x w) Partially filled Channel made of natural stone and concrete High flow dynamics Definition of tasks Detection of readings of a service reservoir intake for vol

Flow Measurement to Ensure Minimum Discharge

Flow Measurement to Ensure Minimum Discharge Flowing Waters - Irrigation & Drainage Systems Application Trapezoid channel 7.0 x 3.0 m (w x h) Partially filled Concrete channel bottom, embankment reinforced with water engineered stones Upstream adjustable water separator Definition of tasks Flow meas

Irrigation Channel Flow Measurement

Irrigation Channel Flow Measurement Flowing Waters - Irrigation & Drainage Systems Application Trapezoid concrete channel 9.5 x 2.5 m (w x h) Partially filled Very high volumes and velocities from time to time Definition of tasks Detection and control of the volumes removed for irrigation purposes T

Portable Measurements

Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions

Hybrid Flow Measurement in Main Collector

Hybrid Flow Measurement in Main Collector Channel Networks - Fix Installation Measurements Application Hood profile 2200 x 1980 Partially filled and full Precast concrete parts Sedimentation and temporary overflow Definition of tasks Detection of flow rates in a large main collector of a combined se

Flow Rate Monitoring on Pumps

Flow Rate Monitoring on Pumps Channel Networks - Pump Stations and Lifting Facilities Application Cast iron pipe DN 200 Full filled Old existing line (condition unknown), installed pipe system cannot be modified Definition of tasks Flow rate monitoring of feed pump to detect clogging and dry run Ten

Hello
We are glad to have you here! For any question regarding water or digitisation we are happy to answer you call or your email message.