2079 Results found

No Shutting Down the Flow

No Shutting Down the Flow Channel Networks - Fix Installation Measurements Application The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel Application required to be installed in just 1 day Definition of tasks To be able to measure Flow without shutting do

Fix Installation Measurements

Fix Installation Measurements Channel Networks

Seepage Water

Seepage Water Flow measurement in landfill leachate for sewage master plan

Dam Intake Measurement

Dam Intake Measurement Flowing Waters - Power Plants Application Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls Partially filled Rainwater and surface water Short calming section Manual detection of flow rates (level reading and Q/h-table) destroyed after fl

Flow Measurement Using Inverted ''Goose Neck'' Syphon

Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Fully filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guara

Replacement of Measurement with inverted Syphon

Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o

Return Sludge Flow Measurement

Return Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.7 m diameter, made of stainless steel Fully filled Point of installation in telescopic pipe Definition of tasks Detection of sludge volumes to monitor and to control even sludge discharge from the se

Hot Sludge Flow Measurement

Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Fully filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digesti

Flow Measurement in Venturi Flume

Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi

Partial Discharge Section Flow Measurement

Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re

Hello
We are glad to have you here! For any question regarding water or digitisation we are happy to answer you call or your email message.