Flow Measurement to create a Sewage Master Plan Channel Networks - Portable Measurements Application Concrete pipe DN 500 Partially filled High discharge dynamics Risk of sedimentation Definition of tasks Detection of precipitation, flow, level and flood covering a minimum period of 3 months to crea
Determination of Infiltration Water in small Pipelines Channel Networks - Portable Measurements Application Concrete pipe DN 250 Partially filled, low level Very low flow rates Ex Zone 1 No mains power supply available Definition of tasks Continuous flow rate measurement to determine the extraneous
Discharge Control of Stormwater Overflow Tank Channel Networks - Stormwater Treatment Facilities Application Pipe diameter 0.3 m, made of galvanised steel Partially filled Low filling levels during night times Definition of tasks Continuous measurement and flow rate control on a stormwater overflow
Determination of Infiltration Water in larger Diameters Channel Networks - Portable Measurements Application Pipe with 0.6 m diameter, made of concrete Partially filled Ex zone 1 Definition of tasks Continuous flow rate measurement in dry weather conditions to detect extraneous water volumes within
Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions
Seepage Water Flow measurement in landfill leachate for sewage master plan
Level Measurement Pump Well Channel Networks - Pump Stations and Lifting Facilities Application Well diameter 1.8 m Depth of well 6.5 m Two wet installed pumps Pressure pipe installed in the centre Definition of tasks Pump control in alternate duty assist mode Switching points at levels of 2 m and 4
Flow Rate Monitoring on Pumps Channel Networks - Pump Stations and Lifting Facilities Application Cast iron pipe DN 200 Full filled Old existing line (condition unknown), installed pipe system cannot be modified Definition of tasks Flow rate monitoring of feed pump to detect clogging and dry run Ten
Flow Measurement In Pipe That Could Not Be Shut Down Channel Networks - Fix Installation Measurements Application To supply high accuracy flow meter on a new works application, cost was an issue and maintaining a Mag meter was another issue. Definition of tasks The task was to find savings by not in
Flow Measurement Pumps Flow Measurement Pumps Application Pipe diameter 0.15 m, made of steel Full pipe Wet pumps Definition of tasks Determination of efficiency and alert when reaching the wear limit Quick and cost-efficient upgrade of a wastewater pump station with a flow measurement Measurement i