Flow Measurement Pumps Flow Measurement Pumps Application Pipe diameter 0.15 m, made of steel Full pipe Wet pumps Definition of tasks Determination of efficiency and alert when reaching the wear limit Quick and cost-efficient upgrade of a wastewater pump station with a flow measurement Measurement i
No Shutting Down the Flow Channel Networks - Fix Installation Measurements Application The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel Application required to be installed in just 1 day Definition of tasks To be able to measure Flow without shutting do
Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions
Fix Installation Measurements Channel Networks
Seepage Water Flow measurement in landfill leachate for sewage master plan
Dam Intake Measurement Flowing Waters - Power Plants Application Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls Partially filled Rainwater and surface water Short calming section Manual detection of flow rates (level reading and Q/h-table) destroyed after fl
Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o
Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Fully filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guara
Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi
Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re