2093 Results found

Ultrasonic flow measurement drives efficiency improvements at Five Fords WwTW

Ultrasonic flow measurement drives efficiency improvements at Five Fords WwTW Engineers working on a project in North Wales have employed novel techniques to improve wastewater treatment efficiency, reportedly at a fraction of the cost of traditional methods, saving an estimated £3.5 million. Alison

Stormwater Treatment Facilities

Stormwater Treatment Facilities Detection of discharge volumes partially with GPRS monitoring, discharge measurement and throttle monitoring in stormwater treatment plants

Discharge Measurement in confined Spaces

Discharge Measurement in confined Spaces Channel Networks - Stormwater Treatment Facilities Application Stormwater overflow tank with cover Maximum overflow head 0.35 m Very low distance between weir crest and ceiling (0.50 m) Definition of tasks Detection of impoundage (beginning and end) Output of

Discharge Measurement

Discharge Measurement Channel Networks - Stormwater Treatment Facilities Application Rectangular channel, 6 m width Partially filled Simultaneous overflow from several chambers into one common channel Short calming section upstream of measuring point Definition of tasks Detection of overflow volumes

Discharge Control of Stormwater Overflow Tank

Discharge Control of Stormwater Overflow Tank Channel Networks - Stormwater Treatment Facilities Application Pipe diameter 0.3 m, made of galvanised steel Partially filled Low filling levels during night times Definition of tasks Continuous measurement and flow rate control on a stormwater overflow

Flow Measurement at Overflow Sil

Flow Measurement at Overflow Sil Wastewater Treatment Plant-Stormwater Treatment Facilities Application Pipe with 1.5m diameter, overflow on the side Partially filled Concrete construction Definition of Task Stormwater overflow measurement in intake area of a WWTP according to EC self-monitoring reg

Case Study | New drainage master plan for Munich's sewer network

New drainage master plan for Munich's sewer network Measurement campaign creates high-quality database for precipitation, discharge and pollution load Munich's municipal drainage system (MSE) is currently developing a new drainage master plan (GEP) to optimise water protection and drainage comfort.

Smart Monitoring for a Smarter Wastewater System in Požega

Smart Monitoring for a Smarter Wastewater System in Požega Flooding, unpredictable wastewater loads, and overflow risks have long been challenges for urban drainage networks. In recent years, Požega has experienced several significant storms and flooding events, primarily due to intense rainfall and

Stormwater Treatment Facilities

Stormwater Treatment Facilities Flow measurement on spillways according to self-monitoring regulation

Replacing a defective System while avoiding high Costs

Replacing a defective System... ...while avoiding high Costs Measurement site with pipe-mounting-system, POA-Sensor (v-measurement), as well as OCL-Sensor (h-measurement) to measure the flow At the weir The Challenge The customer faced a challenge with a defective MID DN2000 in an overflow channel.

Ihr Ansprechpartner
Gerne sind wir bei der Auswahl des geeigneten Produktes behilflich.