Mine Water Flow Measurement Industry - Surface mining Application Rectangular concrete channel 2.5 x 1.5 m (w x h) Partially filled Pit water purification system of a brown coal surface mining plant Medium with high solid contents (iron ochre) Definition of tasks Continuous volume measurement for su
Contactless Flow Measurement on Fish Ladder Flowing Waters - Special Constructions Application Concrete intake channel 3.0 x 2.0 m (w x h) Partially filled Gravel bed Definition of tasks Flow measurement to ensure a minimum water volume required for the fish ladder No sensors can be installed on the
Flow Measurement on Flood Polder Flowing Waters - Flood Protection Application Concrete duct 6 x 3.5 m (w x h) Partially filled 3 parallel ducts Very high flow dynamics featuring flow rates up to 82 000 l/s Definition of tasks Detection of flood polder flow volumes of a large European river Control
Flow Measurement to Ensure Minimum Discharge Flowing Waters - Irrigation & Drainage Systems Application Trapezoid channel 7.0 x 3.0 m (w x h) Partially filled Concrete channel bottom, embankment reinforced with water engineered stones Upstream adjustable water separator Definition of tasks Flow meas
Flow Measurement on Sluice Flowing Waters - Special Constructions Application Rectangular channel 5 x 5 m Part filled Concrete lining Flow in both directions possible Definition of tasks Measurement of feed and drain volumes in the system channel to sluice chambers High accuracy required to create a
River Discharge Flowing Waters - River Discharge Application Stone river banks and bedding River width: 4,95m Water depth: from 15cm to 40cm Definition of tasks Discharge measurement in dry period to establish the river continuity. Instantaneous flow calculation from level and velocity measurement d
Sludge Level Measurement Groundwater Treatment Flowing Waters - Irrigation & Drainage Systems Application Multi-stage container plant Chamber size 2.4 x 2.9 x 12.2 m (w x h x d) Aerated, limed groundwater with approx. 80 mg/l iron ochre contents Built-in lamella filters Definition of tasks Continuou
Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Fully filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guara
Dam Intake Measurement Flowing Waters - Power Plants Application Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls Partially filled Rainwater and surface water Short calming section Manual detection of flow rates (level reading and Q/h-table) destroyed after fl
Flow Measurement Impoundage Shield Wastewater Treatment Plant - Discharge Area Application Pipe DN 400, made of stainless steel Partially filled Only short measuring section available Low nightly discharge Definition of tasks Implementation of discharge measurement to replace flat-rate billing using