1855 Results found

Sludge Treatment

Sludge Treatment Flow measurement for recirculation, return sludge and heating sludge as well as interface measurement in preliminary thickeners

Secondary Clarification

Secondary Clarification Sludge level measurement in round and rectangular tanks as well as interface measurement in combined tanks

Special Constructions

Special Constructions Contactless flow measurement for ensure minimum water volumes.

Power Plants

Power Plants Flow measurement in turbine intakes and for cooling water

Flood Protection

Flood Protection Flow measurements for flood protection on dams or polders

Flow Measurement under poor hydraulic Conditions

Flow Measurement under poor hydraulic Conditions Channel Networks - Portable Measurements Application Drainage line DN 300 of leisure park Partially filled Concrete drainage line in ailing condition High discharge dynamics and turbulent discharge due to upstream feed pump Ex Zone 1 Definition of tas

Efficiency Measurement and Ex-proof GPRS Data Transmission

Efficiency Measurement and Ex-proof GPRS Data Transmission Channel Networks - Portable Measurements Application Concrete pipe DN 1200 Partially filled Levels temporarily tending to zero No power supply available Ex Zone 1 Definition of tasks Temporary installation of a flow measurement system to inv

Flow Measurement to create a Sewage Master Plan

Flow Measurement to create a Sewage Master Plan Channel Networks - Portable Measurements Application Concrete pipe DN 500 Partially filled High discharge dynamics Risk of sedimentation Definition of tasks Detection of precipitation, flow, level and flood covering a minimum period of 3 months to crea

Determination of Infiltration Water in small Pipelines

Determination of Infiltration Water in small Pipelines Channel Networks - Portable Measurements Application Concrete pipe DN 250 Partially filled, low level Very low flow rates Ex Zone 1 No mains power supply available Definition of tasks Continuous flow rate measurement to determine the extraneous

Determination of Infiltration Water in larger Diameters

Determination of Infiltration Water in larger Diameters Channel Networks - Portable Measurements Application Pipe with 0.6 m diameter, made of concrete Partially filled Ex zone 1 Definition of tasks Continuous flow rate measurement in dry weather conditions to detect extraneous water volumes within

Hello
We are glad to have you here! For any question regarding water or digitisation we are happy to answer you call or your email message.