Fix Installation Measurements Channel Networks
Sludge Flow Measurement in Recirculation Line Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.4 m diameter, made of stainless steel Fully filled High pollution load, up to 1 % dry solids Definition of tasks Failsafe and stable measurement of the return sludge conveyed using scr
Flow Measurement in large WWTP Intake Area Wastewater Treatment Plant - Intake Area Application Structured U profie made of concrete, 2.5 x 2.5 m (w x h) with dry weather channel Partially filled Very high discharge dynamics Risk of sedimentation during nighttime Definition of tasks Detection of flo
Return Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.7 m diameter, made of stainless steel Fully filled Point of installation in telescopic pipe Definition of tasks Detection of sludge volumes to monitor and to control even sludge discharge from the se
Separation Layer Measurement in Primary Clarifier Wastewater Treatment Plant - Preclarification Application Rectangular basin 30 m x 8.5 m with two outlet funnels Basin depth 2.8 m Funnel depth 5.8 m Definition of tasks Sludge discharge control depending on the sludge level Continuous detection of b
Volume Measurement Overhead Tank Water Supply - Drinking Water Application Pipe with 0.25 m diameter, made of cast iron Fully filled Overhead tank featuring one single pipeline and flow in both directions Definition of tasks Comparison between water volumes consumed within the supply network during
Independent Level Measurement Independent Level Measurement Application Measuring tube with 150 mm diameter No power supply available on site Definition of tasks Groundwater level measurement at multiple level measurement spots Data logger installed in measuring tube Stable and reliable data transmi
Level Measurement Screening Debris Container Wastewater Treatment Plant - Intake Area Application Screenings container, 2.5 x 2.5 x 4.0 m (w x h x d) Medium: solid mixture Bulk cone with undefined angle Ex-Zone 1 Definition of tasks Level detection inscreenings container for overflow monitoring and
Contactless Flow Measurement Wastewater Treatment Plant - Intake Area Application Concrete channel, width 1.2 m Partially filled Measurement point upstream of screen and grit trap High sedimentation loads Definition of tasks Intake measurement as control measure to avoid WWTP flood Contactless measu