Self-sufficient flow measurement Industry - Surface mining Application Rectangular concrete channel, 2.4 x 1.0 m (w x h) Partially filled No power supply Definition of tasks Detection of the discharge volumes from pit water purification system Automated regular remote data transmission Installation
Flow Measurement Protected Area Drainage Flowing Waters - Flood Protection Application Steel pipeline DN 500 Fully filled Groundwater without any pollution Measurement system permanently immersed due to short calming section Definition of tasks Detection of drained volumes in the low-lying protectiv
Mine Water Flow Measurement Industry - Surface mining Application Rectangular concrete channel 2.5 x 1.5 m (w x h) Partially filled Pit water purification system of a brown coal surface mining plant Medium with high solid contents (iron ochre) Definition of tasks Continuous volume measurement for su
Contactless Flow Measurement on Fish Ladder Flowing Waters - Special Constructions Application Concrete intake channel 3.0 x 2.0 m (w x h) Partially filled Gravel bed Definition of tasks Flow measurement to ensure a minimum water volume required for the fish ladder No sensors can be installed on the
Cooling Water Tap Industry - Chemical Industry Application Closed concrete rectangular channel, 3.8 x 3.5 m (h x w) Part filled Definition of tasks Pump control as well as the cooling process require to permanently control the flow within the cooling water channel The inflow must be controlled due t
Flow Measurement on Sluice Flowing Waters - Special Constructions Application Rectangular channel 5 x 5 m Part filled Concrete lining Flow in both directions possible Definition of tasks Measurement of feed and drain volumes in the system channel to sluice chambers High accuracy required to create a
The Perfect Measurement Technology for Your Needs State of the Art Technology, Quality and best Consultance The task we face is simply formulated: we want to provide you with the perfect measurement solution for your application. One of the most important key aspects for ideal measurement solutions
We plan the future every day With our own research and development division New things never come out of nothing. Those who want to achieve progress need to step ahead. This is why our team of physicists, engineers and technicians is committed to integrating our customer’s requirements into their da
Sludge Level Measurement Groundwater Treatment Flowing Waters - Irrigation & Drainage Systems Application Multi-stage container plant Chamber size 2.4 x 2.9 x 12.2 m (w x h x d) Aerated, limed groundwater with approx. 80 mg/l iron ochre contents Built-in lamella filters Definition of tasks Continuou
Flow Measurement Impoundage Shield Wastewater Treatment Plant - Discharge Area Application Pipe DN 400, made of stainless steel Partially filled Only short measuring section available Low nightly discharge Definition of tasks Implementation of discharge measurement to replace flat-rate billing using