1886 Results found

Industry

Industry Flow measurement and turbidity measurement in industrial applications

Water Supply

Water Supply Flow measurement and level measurement for water supplies

Flowing Waters

Flowing Waters Flow measurement in open flowing waters

Flow Measurement under poor hydraulic Conditions

Flow Measurement under poor hydraulic Conditions Channel Networks - Portable Measurements Application Drainage line DN 300 of leisure park Partially filled Concrete drainage line in ailing condition High discharge dynamics and turbulent discharge due to upstream feed pump Ex Zone 1 Definition of tas

Flow Measurement to create a Sewage Master Plan

Flow Measurement to create a Sewage Master Plan Channel Networks - Portable Measurements Application Concrete pipe DN 500 Partially filled High discharge dynamics Risk of sedimentation Definition of tasks Detection of precipitation, flow, level and flood covering a minimum period of 3 months to crea

Determination of Infiltration Water in small Pipelines

Determination of Infiltration Water in small Pipelines Channel Networks - Portable Measurements Application Concrete pipe DN 250 Partially filled, low level Very low flow rates Ex Zone 1 No mains power supply available Definition of tasks Continuous flow rate measurement to determine the extraneous

Discharge Control of Stormwater Overflow Tank

Discharge Control of Stormwater Overflow Tank Channel Networks - Stormwater Treatment Facilities Application Pipe diameter 0.3 m, made of galvanised steel Partially filled Low filling levels during night times Definition of tasks Continuous measurement and flow rate control on a stormwater overflow

Level Measurement Pump Well

Level Measurement Pump Well Channel Networks - Pump Stations and Lifting Facilities Application Well diameter 1.8 m Depth of well 6.5 m Two wet installed pumps Pressure pipe installed in the centre Definition of tasks Pump control in alternate duty assist mode Switching points at levels of 2 m and 4

Spiral Pump Control

Spiral Pump Control Channel Networks - Pump Stations and Lifting Facilities Application Wastewater lifting facility with three spiral conveyors. Delivery head approx. 9.00 m Definition of tasks Non-contact level measurement for alternating control of spiral conveyors Redundant Panel mount enclosure

Portable Measurements

Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions

Hello
We are glad to have you here! For any question regarding water or digitisation we are happy to answer you call or your email message.