Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Fully filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guara
Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o
Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Fully filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digesti
Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi
Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re
Fix Installation Measurements Channel Networks
Sludge Flow Measurement in Recirculation Line Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.4 m diameter, made of stainless steel Fully filled High pollution load, up to 1 % dry solids Definition of tasks Failsafe and stable measurement of the return sludge conveyed using scr
Flow Measurement in large WWTP Intake Area Wastewater Treatment Plant - Intake Area Application Structured U profie made of concrete, 2.5 x 2.5 m (w x h) with dry weather channel Partially filled Very high discharge dynamics Risk of sedimentation during nighttime Definition of tasks Detection of flo
Return Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.7 m diameter, made of stainless steel Fully filled Point of installation in telescopic pipe Definition of tasks Detection of sludge volumes to monitor and to control even sludge discharge from the se
Separation Layer Measurement in Primary Clarifier Wastewater Treatment Plant - Preclarification Application Rectangular basin 30 m x 8.5 m with two outlet funnels Basin depth 2.8 m Funnel depth 5.8 m Definition of tasks Sludge discharge control depending on the sludge level Continuous detection of b