Digitization for Water Supply Stadtbetrieb Bornheim AöR relies on standardized system from NIVUS Initial Situation and Task The Bornheim municipal utility is responsible for more than 200 km of branched sewer network as well as drinking water and waste water connections for almost 50,000 inhabitants
Seepage Measurement in Dam Flowing Waters - Flood Protection Application Dam wall 130 years old, approx. 500 m length, made of quarry stone with clay core Gallery inside of dam wall to check seepage volumes Seepage volumes ranging from ml/s to l/s Currently seepage water volumes are manually determi
Food Industry - Flow and Analysis Measurement Industry - Food Industry Application Pipe with 0.3 m diameter, made of HDPE Partially filled Shift production Heavy flow fluctuation Low sedimentation Definition of tasks Installation of a measurement place for billing purposes including flow rate and pH
Dam Intake Measurement Flowing Waters - Power Plants Application Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls Partially filled Rainwater and surface water Short calming section Manual detection of flow rates (level reading and Q/h-table) destroyed after fl
Chemical Industry - Cooling Water Tap Industry - Chemical Industry Application Closed concrete rectangular channel, 3.8 x 3.5 m (h x w) Partially filled Definition of tasks Pump control as well as the cooling process require to permanently control the flow within the cooling water channel The inflow
Critical Flow Measurement in Big Pipe Industry - Power Plants Application Pipe DN 2400 made of wrapped GRP Partially filled Cooling water (seawater) with max. flow rate of 60.00³/h from power plant Definition of tasks Accurate flow detection at flow velocities up to 6 m/s No holes are allowed to be
Flow Measurement in Gold Ore Processing Plant Industry - Surface mining Application Stainless steel pipe DN 500 Partial filling with heavy fluctuation Acidified, very turbid water (approx. 50 NTU) Definition of tasks Replacement of a non-functioning clamp-on measurement Continuous flow measurement t
Flow Measurement Protected Area Drainage Flowing Waters - Flood Protection Application Steel pipeline DN 500 Fully filled Groundwater without any pollution Measurement system permanently immersed due to short calming section Definition of tasks Detection of drained volumes in the low-lying protectiv
Contaminated Groundwater Flow Measurement Flowing Waters - Irrigation & Drainage Systems Application Trapezoid channel 1.5 x 0.5 m (w x h) Partially filled Concrete channel bottom, embankment reinforced with water engineered stones Remote measurement place Definition of tasks Flow measurement in par