Flow Rate Monitoring on Pumps Channel Networks - Pump Stations and Lifting Facilities Application Cast iron pipe DN 200 Full filled Old existing line (condition unknown), installed pipe system cannot be modified Definition of tasks Flow rate monitoring of feed pump to detect clogging and dry run Ten
Flow Measurement In Pipe That Could Not Be Shut Down Channel Networks - Fix Installation Measurements Application To supply high accuracy flow meter on a new works application, cost was an issue and maintaining a Mag meter was another issue. Definition of tasks The task was to find savings by not in
No Shutting Down the Flow Channel Networks - Fix Installation Measurements Application The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel Application required to be installed in just 1 day Definition of tasks To be able to measure Flow without shutting do
Sludge Flow Measurement in Recirculation Line Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.4 m diameter, made of stainless steel Full filled High pollution load, up to 1 % dry solids Definition of tasks Failsafe and stable measurement of the return sludge conveyed using scre
Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Full filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digestio
Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Full filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Rec
Return Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.7 m diameter, made of stainless steel Full filled Point of installation in telescopic pipe Definition of tasks Detection of sludge volumes to monitor and to control even sludge discharge from the sec
Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Full filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guaran
Separation Layer Measurement in Primary Clarifier Wastewater Treatment Plant - Preclarification Application Rectangular basin 30 m x 8.5 m with two outlet funnels Basin depth 2.8 m Funnel depth 5.8 m Definition of tasks Sludge discharge control depending on the sludge level Continuous detection of b