Secondary Clarification Sludge level measurement in round and rectangular tanks as well as interface measurement in combined tanks
Intake Area Flow measurements and level measurement in open and closed channels and pipes in WWTP intake areas
Preclarification Flow measurement and interface measurement in WWTP primary treatment areas
Power Plants Flow measurement in turbine intakes and for cooling water
Flood Protection Flow measurements for flood protection on dams or polders
Efficiency Measurement and Ex-proof GPRS Data Transmission Channel Networks - Portable Measurements Application Concrete pipe DN 1200 Partially filled Levels temporarily tending to zero No power supply available Ex Zone 1 Definition of tasks Temporary installation of a flow measurement system to inv
Discharge Measurement in confined Spaces Channel Networks - Stormwater Treatment Facilities Application Stormwater overflow tank with cover Maximum overflow head 0.35 m Very low distance between weir crest and ceiling (0.50 m) Definition of tasks Detection of impoundage (beginning and end) Output of
Discharge Measurement Channel Networks - Stormwater Treatment Facilities Application Rectangular channel, 6 m width Partially filled Simultaneous overflow from several chambers into one common channel Short calming section upstream of measuring point Definition of tasks Detection of overflow volumes
Determination of Infiltration Water in larger Diameters Channel Networks - Portable Measurements Application Pipe with 0.6 m diameter, made of concrete Partially filled Ex zone 1 Definition of tasks Continuous flow rate measurement in dry weather conditions to detect extraneous water volumes within
Wastewater Treatment Plant Flow measurement, level measurement, interface or turbidity measurement in WWTPs