Determination of Infiltration Water in small Pipelines Channel Networks - Portable Measurements Application Concrete pipe DN 250 Partially filled, low level Very low flow rates Ex Zone 1 No mains power supply available Definition of tasks Continuous flow rate measurement to determine the extraneous
Discharge Measurement Channel Networks - Stormwater Treatment Facilities Application Rectangular channel, 6 m width Partially filled Simultaneous overflow from several chambers into one common channel Short calming section upstream of measuring point Definition of tasks Detection of overflow volumes
Determination of Infiltration Water in larger Diameters Channel Networks - Portable Measurements Application Pipe with 0.6 m diameter, made of concrete Partially filled Ex zone 1 Definition of tasks Continuous flow rate measurement in dry weather conditions to detect extraneous water volumes within
Wastewater Treatment Plant Flow measurement, level measurement, interface or turbidity measurement in WWTPs
Water Supply Flow measurement and level measurement for water supplies
Flowing Waters Flow measurement in open flowing waters
Flow Measurement to create a Sewage Master Plan Channel Networks - Portable Measurements Application Concrete pipe DN 500 Partially filled High discharge dynamics Risk of sedimentation Definition of tasks Detection of precipitation, flow, level and flood covering a minimum period of 3 months to crea
Discharge Control of Stormwater Overflow Tank Channel Networks - Stormwater Treatment Facilities Application Pipe diameter 0.3 m, made of galvanised steel Partially filled Low filling levels during night times Definition of tasks Continuous measurement and flow rate control on a stormwater overflow
Level Measurement Pump Well Channel Networks - Pump Stations and Lifting Facilities Application Well diameter 1.8 m Depth of well 6.5 m Two wet installed pumps Pressure pipe installed in the centre Definition of tasks Pump control in alternate duty assist mode Switching points at levels of 2 m and 4
Flow Measurement In Pipe That Could Not Be Shut Down Channel Networks - Fix Installation Measurements Application To supply high accuracy flow meter on a new works application, cost was an issue and maintaining a Mag meter was another issue. Definition of tasks The task was to find savings by not in