1883 Results found

Dam Intake Measurement

Dam Intake Measurement Flowing Waters - Power Plants Application Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls Partially filled Rainwater and surface water Short calming section Manual detection of flow rates (level reading and Q/h-table) destroyed after fl

Replacement of Measurement with inverted Syphon

Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o

Hot Sludge Flow Measurement

Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Fully filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digesti

Flow Measurement in Venturi Flume

Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi

Partial Discharge Section Flow Measurement

Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re

Sludge Flow Measurement in Recirculation Line

Sludge Flow Measurement in Recirculation Line Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.4 m diameter, made of stainless steel Fully filled High pollution load, up to 1 % dry solids Definition of tasks Failsafe and stable measurement of the return sludge conveyed using scr

Flow Measurement in large WWTP Intake Area

Flow Measurement in large WWTP Intake Area Wastewater Treatment Plant - Intake Area Application Structured U profie made of concrete, 2.5 x 2.5 m (w x h) with dry weather channel Partially filled Very high discharge dynamics Risk of sedimentation during nighttime Definition of tasks Detection of flo

Level Measurement Screening Debris Container

Level Measurement Screening Debris Container Wastewater Treatment Plant - Intake Area Application Screenings container, 2.5 x 2.5 x 4.0 m (w x h x d) Medium: solid mixture Bulk cone with undefined angle Ex-Zone 1 Definition of tasks Level detection inscreenings container for overflow monitoring and

Contactless Flow Measurement

Contactless Flow Measurement Wastewater Treatment Plant - Intake Area Application Concrete channel, width 1.2 m Partially filled Measurement point upstream of screen and grit trap High sedimentation loads Definition of tasks Intake measurement as control measure to avoid WWTP flood Contactless measu

Open Channel Flow Measurement

Open Channel Flow Measurement Wastewater Treatment Plant - Intake Area Application Rectangular channel made of concrete, width 1m Partially filled Strong fluctuation between daily and nightly inflow Definition of tasks Continuous flow rate measurement in a WWTP intake area Additional external level

Hello
We are glad to have you here! For any question regarding water or digitisation we are happy to answer you call or your email message.