No Shutting Down the Flow Channel Networks - Fix Installation Measurements Application The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel Application required to be installed in just 1 day Definition of tasks To be able to measure Flow without shutting do
Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions
Seepage Water Flow measurement in landfill leachate for sewage master plan
Hybrid Flow Measurement in Main Collector Channel Networks - Fix Installation Measurements Application Hood profile 2200 x 1980 Partially filled and full Precast concrete parts Sedimentation and temporary overflow Definition of tasks Detection of flow rates in a large main collector of a combined se
Dam Intake Measurement Flowing Waters - Power Plants Application Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls Partially filled Rainwater and surface water Short calming section Manual detection of flow rates (level reading and Q/h-table) destroyed after fl
Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Fully filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guara
Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o
Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Fully filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digesti
Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi
Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re