Flow Measurement on Flood Polder Flowing Waters - Flood Protection Application Concrete duct 6 x 3.5 m (w x h) Partially filled 3 parallel ducts Very high flow dynamics featuring flow rates up to 82 000 l/s Definition of tasks Detection of flood polder flow volumes of a large European river Control
Irrigation Channel Flow Measurement Flowing Waters - Irrigation & Drainage Systems Application Trapezoid concrete channel 9.5 x 2.5 m (w x h) Partially filled Very high volumes and velocities from time to time Definition of tasks Detection and control of the volumes removed for irrigation purposes T
Sludge Level Measurement Groundwater Treatment Flowing Waters - Irrigation & Drainage Systems Application Multi-stage container plant Chamber size 2.4 x 2.9 x 12.2 m (w x h x d) Aerated, limed groundwater with approx. 80 mg/l iron ochre contents Built-in lamella filters Definition of tasks Continuou
Discharge Measurement in confined Spaces Channel Networks - Stormwater Treatment Facilities Application Stormwater overflow tank with cover Maximum overflow head 0.35 m Very low distance between weir crest and ceiling (0.50 m) Definition of tasks Detection of impoundage (beginning and end) Output of
Level Measurement Pump Well Channel Networks - Pump Stations and Lifting Facilities Application Well diameter 1.8 m Depth of well 6.5 m Two wet installed pumps Pressure pipe installed in the centre Definition of tasks Pump control in alternate duty assist mode Switching points at levels of 2 m and 4
Flow Measurement Pumps Flow Measurement Pumps Application Pipe diameter 0.15 m, made of steel Full pipe Wet pumps Definition of tasks Determination of efficiency and alert when reaching the wear limit Quick and cost-efficient upgrade of a wastewater pump station with a flow measurement Measurement i
Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions Flow Measurement to create a Sewage Master Plan Detection of precipitation, flow, level and flood covering a minimum period of 3 months to c
1. Application Wastewater Water Supply Hydropower Surface water Industry Help & Contact
Seepage Water Flow measurement in landfill leachate for sewage master plan
Fix Installation Measurements Channel Networks Channel Dry Weather Flume Segmented rectangular channel, 3 m width, made of concrete. Part filled. Channel with dry weather flume and side space. Flow Measurement in large Collector Duct Trapezoid canal with dry weather flume and sloping bottom. Precipi