1855 Results found

Wastewater Treatment Plant

Wastewater Treatment Plant Flow measurement, level measurement, interface or turbidity measurement in WWTPs

News & Press

Press

Flow Measurement in Gold Ore Processing Plant

Flow Measurement in Gold Ore Processing Plant Industry - Surface mining Application Stainless steel pipe DN 500 Partial filling with heavy fluctuation Acidified, very turbid water (approx. 50 NTU) Definition of tasks Replacement of a non-functioning clamp-on measurement Continuous flow measurement t

Flow Measurement Protected Area Drainage

Flow Measurement Protected Area Drainage Flowing Waters - Flood Protection Application Steel pipeline DN 500 Fully filled Groundwater without any pollution Measurement system permanently immersed due to short calming section Definition of tasks Detection of drained volumes in the low-lying protectiv

Mine Water Flow Measurement

Mine Water Flow Measurement Industry - Surface mining Application Rectangular concrete channel 2.5 x 1.5 m (w x h) Partially filled Pit water purification system of a brown coal surface mining plant Medium with high solid contents (iron ochre) Definition of tasks Continuous volume measurement for su

Contactless Flow Measurement on Fish Ladder

Contactless Flow Measurement on Fish Ladder Flowing Waters - Special Constructions Application Concrete intake channel 3.0 x 2.0 m (w x h) Partially filled Gravel bed Definition of tasks Flow measurement to ensure a minimum water volume required for the fish ladder No sensors can be installed on the

Cooling Water Tap

Cooling Water Tap Industry - Chemical Industry Application Closed concrete rectangular channel, 3.8 x 3.5 m (h x w) Part filled Definition of tasks Pump control as well as the cooling process require to permanently control the flow within the cooling water channel The inflow must be controlled due t

Flow Measurement on Sluice

Flow Measurement on Sluice Flowing Waters - Special Constructions Application Rectangular channel 5 x 5 m Part filled Concrete lining Flow in both directions possible Definition of tasks Measurement of feed and drain volumes in the system channel to sluice chambers High accuracy required to create a

Downloadcenter

Hello!
We are happy to answer any questions you may have about water and digitalization. We look forward to your call or email.