Separation Layer Measurement in Primary Clarifier Wastewater Treatment Plant - Preclarification Application Rectangular basin 30 m x 8.5 m with two outlet funnels Basin depth 2.8 m Funnel depth 5.8 m Definition of tasks Sludge discharge control depending on the sludge level Continuous detection of b
Flow Measurement at Overflow Sil Wastewater Treatment Plant-Stormwater Treatment Facilities Application Pipe with 1.5m diameter, overflow on the side Partially filled Concrete construction Definition of Task Stormwater overflow measurement in intake area of a WWTP according to EC self-monitoring reg
Deep Well Level Measurement Water Supply - Groundwater Application Deep drilling 150 m Bore diameter 30 mm Definition of tasks Continuous detection of groundwater level Detection using suspended pressure probe Pressure probe appropriate for small bore diameters of 30 mm Easy installation and removal
Irrigation & Drainage Systems Flow measurement in water reservoir, in irrigation channels and to ensure minimum discharge volumes
Drinking Water Flow measurement for overnight supply, for inlets and outlets in elevated tanks as well as in water pipes. Partially contactless
Groundwater Level measurement in well shafts, for pump control and in water metering shafts. Partially with data transmission via GRPS
Special Constructions Contactless flow measurement for ensure minimum water volumes.
Surface mining Flow measurements with GPRS data transmission and turbidity measurement for drainage
Flood Protection Flow measurements for flood protection on dams or polders
Discharge Measurement in confined Spaces Channel Networks - Stormwater Treatment Facilities Application Stormwater overflow tank with cover Maximum overflow head 0.35 m Very low distance between weir crest and ceiling (0.50 m) Definition of tasks Detection of impoundage (beginning and end) Output of