Stormwater Treatment Facilities Detection of discharge volumes partially with GPRS monitoring, discharge measurement and throttle monitoring in stormwater treatment plants
Portable Measurements Temporary flow measurements for investigation of infiltration (extraneous water), efficiency or even under difficult hydraulic conditions
Seepage Water Flow measurement in landfill leachate for sewage master plan
Hybrid Flow Measurement in Main Collector Channel Networks - Fix Installation Measurements Application Hood profile 2200 x 1980 Partially filled and full Precast concrete parts Sedimentation and temporary overflow Definition of tasks Detection of flow rates in a large main collector of a combined se
Flow Measurement in large Collector Duct Channel Networks - Fix Installation Measurements Application Trapezoid canal with dry weather flume and sloping bottom, 10 m x 2.5 m (w x h) Partially filled Old concrete Lateral inflow upstream of measurement place Definition of tasks Detection of combined s
Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o
Flow Rate Monitoring on Pumps Channel Networks - Pump Stations and Lifting Facilities Application Cast iron pipe DN 200 Full filled Old existing line (condition unknown), installed pipe system cannot be modified Definition of tasks Flow rate monitoring of feed pump to detect clogging and dry run Ten
Channel Dry Weather Flume Channel Networks - Fix Installation Measurements Application Segmented rectangular channel, 3 m width, made of concrete Partially filled Channel with dry weather flume and side space Definition of tasks Accurate detection of dry weather discharge and combined water discharg
Flow Measurement In Pipe That Could Not Be Shut Down Channel Networks - Fix Installation Measurements Application To supply high accuracy flow meter on a new works application, cost was an issue and maintaining a Mag meter was another issue. Definition of tasks The task was to find savings by not in
No Shutting Down the Flow Channel Networks - Fix Installation Measurements Application The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel Application required to be installed in just 1 day Definition of tasks To be able to measure Flow without shutting do