Discharge Area Flow measurement with syphon culvert, Venturi or baffle plate in WWTP discharge areas. Turbidity measurement in testing shaft
Sludge Treatment Flow measurement for recirculation, return sludge and heating sludge as well as interface measurement in preliminary thickeners
Stormwater Treatment Facilities Flow measurement on spillways according to self-monitoring regulation
Secondary Clarification Sludge level measurement in round and rectangular tanks as well as interface measurement in combined tanks
Intake Area Flow measurements and level measurement in open and closed channels and pipes in WWTP intake areas
Preclarification Flow measurement and interface measurement in WWTP primary treatment areas
Power Plants Flow measurement in turbine intakes and for cooling water
Flow Measurement under poor hydraulic Conditions Channel Networks - Portable Measurements Application Drainage line DN 300 of leisure park Partially filled Concrete drainage line in ailing condition High discharge dynamics and turbulent discharge due to upstream feed pump Ex Zone 1 Definition of tas
Efficiency Measurement and Ex-proof GPRS Data Transmission Channel Networks - Portable Measurements Application Concrete pipe DN 1200 Partially filled Levels temporarily tending to zero No power supply available Ex Zone 1 Definition of tasks Temporary installation of a flow measurement system to inv
Determination of Infiltration Water in small Pipelines Channel Networks - Portable Measurements Application Concrete pipe DN 250 Partially filled, low level Very low flow rates Ex Zone 1 No mains power supply available Definition of tasks Continuous flow rate measurement to determine the extraneous