Replacement of Measurement with inverted Syphon

Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o

Flow Measurement in Venturi Flume

Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi

Partial Discharge Section Flow Measurement

Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re

Fix Installation Measurements

Fix Installation Measurements Channel Networks

Hot Sludge Flow Measurement

Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Fully filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digesti

Return Sludge Flow Measurement

Return Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.7 m diameter, made of stainless steel Fully filled Point of installation in telescopic pipe Definition of tasks Detection of sludge volumes to monitor and to control even sludge discharge from the se

Sludge Flow Measurement in Recirculation Line

Sludge Flow Measurement in Recirculation Line Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.4 m diameter, made of stainless steel Fully filled High pollution load, up to 1 % dry solids Definition of tasks Failsafe and stable measurement of the return sludge conveyed using scr

Open Channel Flow Measurement

Open Channel Flow Measurement Wastewater Treatment Plant - Intake Area Application Rectangular channel made of concrete, width 1m Partially filled Strong fluctuation between daily and nightly inflow Definition of tasks Continuous flow rate measurement in a WWTP intake area Additional external level

Detection of Nighttime Volume

Detection of Nighttime Volume Water Supply - Drinking Water Application Pipe with 0.1 m diameter Fully filled Low water volumes of approx. 3 l/s Definition of tasks Detection of problematic low quantities from a drinking water overhead tank during nighttimes Replaces the EMF not working properly due

Separation Layer Measurement in Primary Clarifier

Separation Layer Measurement in Primary Clarifier Wastewater Treatment Plant - Preclarification Application Rectangular basin 30 m x 8.5 m with two outlet funnels Basin depth 2.8 m Funnel depth 5.8 m Definition of tasks Sludge discharge control depending on the sludge level Continuous detection of b