Special Constructions Contactless flow measurement for ensure minimum water volumes.
Power Plants Flow measurement in turbine intakes and for cooling water
Flood Protection Flow measurements for flood protection on dams or polders
Flow Measurement under poor hydraulic Conditions Channel Networks - Portable Measurements Application Drainage line DN 300 of leisure park Partially filled Concrete drainage line in ailing condition High discharge dynamics and turbulent discharge due to upstream feed pump Ex Zone 1 Definition of tas
Efficiency Measurement and Ex-proof GPRS Data Transmission Channel Networks - Portable Measurements Application Concrete pipe DN 1200 Partially filled Levels temporarily tending to zero No power supply available Ex Zone 1 Definition of tasks Temporary installation of a flow measurement system to inv
Determination of Infiltration Water in larger Diameters Channel Networks - Portable Measurements Application Pipe with 0.6 m diameter, made of concrete Partially filled Ex zone 1 Definition of tasks Continuous flow rate measurement in dry weather conditions to detect extraneous water volumes within
Discharge Area Flow measurement with syphon culvert, Venturi or baffle plate in WWTP discharge areas. Turbidity measurement in testing shaft
Sludge Treatment Flow measurement for recirculation, return sludge and heating sludge as well as interface measurement in preliminary thickeners
Secondary Clarification Sludge level measurement in round and rectangular tanks as well as interface measurement in combined tanks
Intake Area Flow measurements and level measurement in open and closed channels and pipes in WWTP intake areas